Skip to Content Facebook Feature Image

CSTB Addresses Coldplay Ticket Printing Errors, Ensures Quick Remedial Actions for Affected Fans

HK

CSTB Addresses Coldplay Ticket Printing Errors, Ensures Quick Remedial Actions for Affected Fans
HK

HK

CSTB Addresses Coldplay Ticket Printing Errors, Ensures Quick Remedial Actions for Affected Fans

2025-03-22 22:50 Last Updated At:22:58

CSTB highly concerned about errors found in tickets of Coldplay: Music of The Spheres World Tour printed by Cityline

​The Culture, Sports and Tourism Bureau (CSTB) today (March 22) is highly concerned about the errors in the printing of some of the tickets for Coldplay: Music of The Spheres World Tour by Cityline.

Upon learning the situation, the CSTB requested Cityline to handle it swiftly and properly, to ensure that the experience of ticket holders would not be affected.

The CSTB learnt that Cityline has provided several remedial measures, including adding ticket exchange locations in Hong Kong and the Mainland, extending the ticket exchange time period until the performance commences, and refunding the handling fees to affected ticket holders, so as to respond to the requests by those affected.

Next Article

Sewer Leak at Deep Water Bay Prompts Emergency Repairs and Swimming Advisory

2025-03-24 21:42 Last Updated At:21:58

Emergency repair works on sewer at Seaview Promenade, Deep Water Bay

A spokesman for the Drainage Services Department (DSD) said today (March 24) that the DSD received a report on sewer leakage at Seaview Promenade, Deep Water Bay, in the evening yesterday (March 23). An investigation was immediately conducted and it was confirmed that the concerned sewer is a 450 millimetres diameter pressurised sewage main. The DSD is carrying out emergency repair works. The quality of the nearby waters will potentially be affected. Members of the public are advised not to swim at Deep Water Bay Beach and Repulse Bay Beach or the nearby waters to protect public health.

The DSD commenced the construction and rehabilitation of sewage rising mains in Southern District in January this year, to construct about 8.8 kilometres of sewage rising mainsconnecting the sewage pumping station at Island Road, Southern District, to the sewerage system at Ap Lei Chau Bridge Road, including the construction of about 1.5km subsea twin pressurised sewer to replace the above concerned pressurised sewage main, to enhance the overall stability of the sewage system.

Recommended Articles
Hot · Posts